skip to Main Content

Hydraulic sizing request

The following information is required to provide a recommendation for a simple run of trench drainage. On receipt of this form, ACO will provide a recommendation with hydraulic calculations where necessary.

For more complex layout please contact ACO .

    CATCHMENT HYDRAULICS

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (l/s)

    TRENCH DRAIN INFORMATION

    A (m)

    B (m)

    Please select

    OTHER INFORMATION

    Trench hydraulic flow informationGrating intake performaceLayout schedule and parts listSurface water storage solutionsPlease contact me to discuss

    ADDITIONAL RUNS

    Run 2

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (l/s)

    A (m)

    B (m)

    Please select

    Run 3

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (l/s)

    A (m)

    B (m)

    Please select

    Run 4

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (l/s)

    A (m)

    B (m)

    Please select

    Run 5

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (l/s)

    A (m)

    B (m)

    Please select


    Length Width
    Rainfall Intensity
    Catchment Slope
    Longitudinal Fall
    Central To Width
    Outlet Position
    Catchment Length
    Load Class
    SUBSCRIBE
    Close
    SUBSCRIBE
    Close
    Back To Top